Deed day in Portugal: what to check before getting the keys
A practical checklist for aligning mortgage, documents, taxes, payment, registration and key handover before completion.

The deed can feel like the end of the purchase. In practice, it is the moment when every loose end since the CPCV has to line up: bank, documents, taxes, registration, payment and key handover.
Key takeaways
- Only book completion once the bank, documents and taxes are aligned.
- For mortgage buyers, check the final FINE, draft contract and reflection period before the date.
- Key handover should include meter readings, remotes, codes, condominium contact and registration proof.
Before booking the deed
After the CPCV, ask for a written list of everything still needed for completion: seller documents, property documents, taxes, bank attendance, cancellation of any seller mortgage, powers of attorney and payment method.
If you need a mortgage, do not book the date based only on a simulation or pre-approval. Final approval should come with the approved FINE and draft credit contract. There is also a mandatory reflection period before the credit can be signed, so that timing has to fit the completion calendar.
Confirm before the date
- who is preparing the act: notary, Casa Pronta, lawyer, solicitor or bank channel;
- who must attend and whether powers of attorney are valid;
- whether the bank has validated valuation, insurance, final FINE and contract;
- whether IMT and stamp duty are already paid or will be handled at Casa Pronta;
- how the seller mortgage will be cancelled, if there is one;
- when and how the keys will be handed over.
Documents you should not see for the first time on the day
Ideally, completion day has no surprises. Review the land registry certificate, tax record, licence or dispensation, energy certificate and condominium documents beforehand. If areas, address, unit, ownership or charges do not match, do not leave that discussion for the signing table.
For Casa Pronta, the service lists civil and tax identification for the parties, the technical housing file if it exists, a deed mentioning the use licence or dispensation for certain buildings, and the energy certificate. The exact list depends on the property and act, so ask the professional handling completion for the final checklist.
| Document | What to confirm |
|---|---|
| Land registry certificate | Owner, unit, mortgages, seizures, charges and pending applications. |
| Tax record | Tax article, use, areas, taxable value and match with the unit. |
| Energy certificate | Valid number or documented exception where applicable. |
| Condominium | Debts, fees, reserve fund, approved works and handover contact. |
Pay attention to the urbanistic title
Since 2024, some formal display requirements at completion have been simplified. That does not make the licence, communication, dispensation or other relevant title irrelevant. For a buyer, the practical question is still: "which document proves this home can be used as it is being sold?"
Payment: align everything before signing
Completion day is not the best moment to discover transfer limits, missing bank cheques or incomplete bank instructions. Confirm in writing how the balance of the price will be paid and who receives each amount.
If there is a mortgage, confirm whether the bank transfers at the signing, issues a bank cheque or sends a representative. If the seller has an existing mortgage, confirm whether part of the price goes directly to repay it and how the cancellation document will be issued.
48 to 72 hours before
- reconfirm final price, deposit already paid and remaining balance;
- confirm IBAN, bank cheque or bank instructions;
- have proof of IMT and stamp duty payment, where applicable;
- check that the land registry certificate has not changed;
- ask for the key, remote and meter-reading handover plan.
On deed day
Read the essential details before signing: names, tax numbers, property identification, price, payment method, mortgage, seller statements, energy certificate reference and credit conditions. If something does not match, stop and ask for clarification.
Key handover should also be concrete. Include door keys, mailbox, garage, storage room, remotes, cards, alarm codes, manuals, guarantees and condominium administrator contact.
Home handover
- photograph water, electricity and gas meters;
- confirm the home is vacant and free of belongings if agreed;
- receive all remotes, cards and codes;
- file the deed, tax proofs, insurance and mortgage contract together;
- note defects or promised items that are still missing.
After completion
After signing, confirm that the land registration is completed or ask for proof of submission. The land registry is what lets you check the legal status of the property, including ownership and charges.
In the following weeks, handle the practical changes: water, electricity and gas contracts, fiscal address, insurance, condominium, resident parking permit where relevant and temporary IMI exemption if you qualify. For IMI, the request is made after changing address and within the applicable period after the deed.
FAQ
Do I always receive the keys on deed day?
Can I sign if a document is missing?
Does Casa Pronta replace a lawyer?
Next step
In the week of completion, run one closing call with the bank, seller and professional handling the act. If an answer is vague, ask for written confirmation. The goal is to reach signing day without improvising.
More guides
June 12, 2026
Mortgage pre-approval vs final approval in Portugal
How to tell simulation, pre-approval and final mortgage approval apart before signing the CPCV or booking the deed in Portugal.
June 19, 2026
CPCV deposit in Portugal: protect your money before the deed
How to assess the CPCV deposit, protect mortgage and valuation risk, keep payment proof and avoid losing money before completion.